4 ways MTWO helps drive better performance for project owners
top of page

4 ways MTWO helps drive better performance for project owners

The project owner initiates construction, finances it and oversees the project as a whole. With all of this owners must deal with numerous stakeholders such as architects, general contractors, specialty contractors and engineers. With all of these project stakeholders collaborating to deliver the desired expectations of a project in a timely fashion, project owners are under great pressure, even more so when undertaking several projects simultaneously. As a result, many factors can influence the overall efficiency and productivity of the project.



Here are some of the main factors that can impede construction project performance:

  • Too many tools that are not connected or integrated with each other

Different systems specialising in different areas of a project that aren't integrated with one another and are being used simultaneously can cause data to be needlessly dispersed from multiple sources. These systems are good at dividing the work up but less effective in making sure everyone’s work fits together. As a result, data is held in separate systems by different teams and so time is wasted transferring this data between different systems.

  • Ineffective internal and external collaboration

Ineffective communication and collaboration often results in projects delays, going over budget or issues with quality control. Especially now in the current situation, efficient collaboration is more important than ever. Those who do it well are rewarded with faster project builds, higher profits and fewer problems with quality and cost management. For large-scale owners with different branches, with project teams and partners located in different sites, it’s even more challenging to facilitate transparent communication between all parties.

  • Data silos leads to time wasted in on-site labour

Data is the most valuable resource in a project, however, organisations tend to have too much unorganised data in too many locations. According to an FMI Whitepaper, 96% of all data captured goes unused in the engineering and construction (E&C) industry, 90% of data generated is unstructured, and 13% of E&C working hours are spent looking for project data and information. That translates into a massive waste of human labour and ultimately effects the bottom line.

  • Long implementation time

One of the top challenges project owners face is the time spent on the implementation phase of construction software, which can take months and even years. Many owners have experienced this challenge and the frustration that comes with with the amount of time and overheard costs involved in implementing new digital construction systems.

Forward-looking owners need to save their valuable time for working on the project


Integrated cloud-based construction management software solutions can help to manage the project lifecycle, the stakeholders and the data. These solutions allow owners to access the latest project data in real time, manage all stakeholders effectively, and manage the project lifecycle, all of which maximises productivity.


From initial concept to completion – one cloud platform for the whole project loop



MTWO the Complete Construction Cloud is one centralised platform for all stakeholders to collaborate at every phase of the building process. When you put all your people, processes, and data into one place, you streamline project workflows, facilitate the dissemination of important and vital communication, and maximise productivity at every turn.

How can MTWO elevate the productivity of construction projects for project owners?

Here are 4 ways …

1. One platform to manage the project lifecycle with open API that allows integration with other software technologies.


As a Complete Construction Cloud platform, the entire lifecycle of the building is virtually simulated in BIM 5D and serves as a basis for smooth physical construction and efficient facility management. All phases of a project are interconnected with one single source of truth.


During the preconstruction phase, by using MTWO 5D BIM simulation, all relevant stakeholders can collaborate from the start. They can explore design alternatives and forecast their cost and time before selecting the optimum plan for the project. The project simulation provides a reliable basis for the decision-making process and helps to avoid potential risks and rework, and their related costs, in any phase of the project.

During the building phase, multiple versions of schedules can be compared easily in the Gantt Chart. Various project site reports will be uploaded to one platform for all relevant teams to review or download. The MTWO desktop and mobile applications provide user-friendly interfaces for reporting progress and defects and can be updated anytime and anywhere.

With MTWO mobile applications, site teams can access the latest project information, capture data in the field, track assigned tasks, and fill out progress reports without shuffling through lifeless spreadsheets or endless email threads. Data is automatically updated on the MTWO platform as soon as it’s entered via mobile apps, ensuring that everyone stays updated and consistently works from the most up-to-date set of data.


For the operation phase, MTWO extends 5D BIM to the important area of facility management. With iTWOfm integrated seamlessly into MTWO all 5D BIM data from the planning and construction phase can be directly transferred to the operation phase. The master data forms the basis for permanently and securely managing your properties, buildings and facilities.


As a highly scalable and open platform, MTWO allows easy integration with other technologies for the construction industry to extend platform capabilities. For instance, MTWO provides seamless integration with the latest mainstream design and ERP software in the industry to manage your finances, supply chain, and stock.


2. One platform to connect all teams both internally and externally


It’s not just a place to store your data. It’s a place for everybody to perform their jobs.”

All internal teams collaborate on one cloud platform. Everyone is kept on the same page with connected data that can be accessed from any device. Project teams can update and synchronise project data in real-time. One team’s data can help other teams in the platform with real-time secure access, bringing enhanced collaboration early on and can help rapidly improve productivity.



With MTWO, owners can connect their GCs, specialty contractors, and suppliers in one system. Business partners have access to real-time project data and can update data from their side on the platform.


MTWO supports company-wide business partnership management, keeping track of project contracts and execution performance of every business partner. Partner evaluation reports can be created based on customised evaluation criteria for future project reference.


3. One single source of truth with BI and AI capabilities


The platform manages data from every project, putting it all together so that users can intuitively utilize past results to establish better processes for future workflows. Based on the data from the platform, the MTWO Control Tower generates interactive dashboards to give team members all the real-time and structured information to know a project’s performance in scope, costs, schedule, and safety, to name just a few, both overall and in detail. Teams can gain full visibility of the immediate project and gain meaningful insights to confidently make final decisions.


  • Gain full visibility of the project status

  • Learn, predict and improve internal processes

  • Being proactive, not reactive



Risk detection and trends prediction with artificial intelligence


By analysing the project's historical data, McTWO artificial intelligence provides predictions, forecasts, and recommendations, allowing teams to make better decisions. For instance, McTWO predicts the impact on project costs and the project schedule from reported defects or issues. With McTWO Chatbot, users access project information within seconds, including business partner evaluation, material cost calculation, and project milestones.


4. Plus, MTWO goes live within 48 hours


The ‘MTWO Go Live in 48 Hours’ solution is designed specifically to reduce long implementation time. Within 48 hours, as best-practice standards, workflows and templates are pre-configured for fast deployment.


Project owners need to consider digital transformation as a means of optimising the business long term. As one of RIB's customers commented: “we decided to go with RIB because we could cover most or all of our capabilities with their solution. This is really how we bring the benefits in all levels in our organisation. The complete project teams, all stakeholders, internal and external partners can communicate and collaborate in a better way.”


What's the overall benefit? A productivity boost of up to 30%.


See how you can help build your next project better, smarter, and faster MTWO Complete Construction Cloud.